Perforated drainpipe installation method & procedure

  • Deck cast installation and rebar placement

  • Catch basin(①) Setting

  • The centerline of the hole on the lateral side of the catch basin is aligned with the upper part of the concrete.

  • Installation of molding material fixation support (②)

  • It should be welded or tied to the rebar at an interval of [C.T.C= 1.5m to 2m]

  • Concave molding material(③) should be installed.

  • The upper surface should be aligned with the upper surface of concrete. And the upper surface should be protected by tapping, etc.

  • Concrete pouring and curing

  • Tapping on upper part of molding material should be removed, and the inside should be cleaned.

  • Bridge deck waterproofing

  • Zinc wire mesh(④) installation and fixation

  • Fixed in zigzag at an interval of [C.T.C=1.5m to 3m)] (nails, hilt, etc.)

  • Ascon installation and compaction