닫기

Business Area

Purpose of Installation

Built with lightweight materials, this facility is intended for checking any cracks or damage in main tower and carrying out maintenance and repair for the internal section from bottom to top of main tower.

Structure and design criteria (draft)

Scope of inspection
Inside of main tower
Applied load
200 KG/M 2
Method of fixation
Embeded nut and anchor bolt
Used material
Aluminum, hot-dip galvanized
Access facilities
Vertical ladder or inclined stairs
 
 

Internal inspection facilities

TOP

개인정보처리방침

이메일주소무단수집거부

SITEMAP

About Us
Business Area
Domestic Construction Achievement
Overseas Track Records
Quality Control
Customer Center