닫기

Business Area

Purpose of Installation

The driving rail is installed under or beside the bridge, regardless of conditions of the lower parts, without need for separate equipment, rather than controlling the traffic flow on the upper part of bridge. Inspection vehicles, outfitted with generators to carry out regular inspection, unscheduled inspection and maintenance, travel whole sections of bridge for visual inspection and maintenance to maximize the life of bridge.

Category of inspection Trolley

For single clear span
Movable inspection Trolley that only travels between pier and pier
For multiple clear span
Inspection Trolley that moves across the bridge regardless of the number of piers

Structure and design criteria (draft)

Inspection limit
Access rate reaches 100%. It is operable, regardless of weather conditions.
Loading capacity
80KG * 6 persons (480KG), equipment (500KG)
Building limits
Passageway width : 1,000mm or more
Driving method
It is operable independently as it is equipped with self-generator (button switch and remote control are used.)
Used material
Inspection Trolley : ordinary steel + hot dip galvanized
Driving rail : hot-dip galvanized or painted
Safety equipment
Pier anti-collision sensor, crash buffer,wheel breakaway protection sensor

Movable inspection Trolley

  • Inspection and operation
  • When passing the piers

Driving of mobile inspection vehicle

  • When being moored
  • Inspection and operation
  • When passing the piers

Examples of applications by bridge shape

Cases of installations abroad

TOP

개인정보처리방침

이메일주소무단수집거부

SITEMAP

About Us
Business Area
Domestic Construction Achievement
Overseas Track Records
Quality Control
Customer Center