닫기

Business Area

Catch basin installation method & procedures

How to install
1 It should be installed 5-10mm lower than upper concrete surface.
It aims to ensure undisrupted drainage of infiltration water from the upper layer of the ascon.
(As bridges have longitudinal and traverse drainpipes, the infiltration water can be guided and drained to the catch basin smoothly without installing any perforated drainpipes separately.)
2 The catch basin should be installed horizontally at the top regardless of the longitudinal and traverse gradients of bridge(it aims to align the lower straight pipe vertically.)
3 It should be pressed until the foam does not descend from the top to the bottom.
4 Apply the tape after covering the top styrofoam lid(to prevent concrete from entering catch basin).
5 Fix the catch basin with the reinforcing bar to prevent the batch basin from moving.
6 Installation completed.
Features
1The lower part is a loop type, increasing the ease of maintenance.
2 Construction is easy and simple.
3 As it is a loop type, no clogging occurs in the drain. (Bolt + shape connection causes clogging)
4 There is no loss of materials such as mold form(cast), etc., because the form is not punctured.
5 Cost-saving effect is over 20 times higher, compared to other catch basins.
6 There is no fear of losing the upper lid(cover) which is an integrated type and a rotating type. (Separated type is often lost or stolen.)

Catch basin

TOP

개인정보처리방침

이메일주소무단수집거부

SITEMAP

About Us
Business Area
Domestic Construction Achievement
Overseas Track Records
Quality Control
Customer Center