No.
- Owner
- Principal contractor
Title of construction
Type of construction work
Period of construction
11
- KOREA/Thermoelectric power plant
- Gs construction
Anyang / combined heat power plant
Gondola installation for Tank and smokestack
2016.12.10 ~ 2017.02.05
12
- Iksan Regional Construction Management Office
- Daelim Industrial Co., Ltd.
Abhae-Amtae(area#1) road construction
external inspection facility , installation of inspection facility inside the pylon
2017.04.01 ~ 2018.08.03
13
- Iksan Regional Construction Management Office
- Daewoo construction
SAECHEONNYOEN construction work
Internal lift pylons installation
2017.09.02 ~ 2019.10.31
14
- Korea Expressway Corporation
- Hyundai construction
Sejong-Pochon(Anseong-Guri) 14
Manufacture and installation for gondola
2019.07.17 ~ 2022.12.31
15
- Korea Meteorological Agency
- Kumkang Engineering Co. LTD
Repair work for Boseong Weather station
Repair of Pylon Lift
2020.07.11 ~ 2020.10.31
16
- Korea Expressway Corporation
- Seohae grand bridge branch office
Reinforcement work in Seohae grand bridge
Repair works for Pylon Gondola
2021.05.10 ~ 2021.10.31
17
Performance improvement construction of the lift at the headquarter building
Repair work of Gondola
2022.07.30 ~ 2022.09.23